Advisory - Solid Fuel Fired Boiler Systems
Summary
Prior to installation, Solid fuel fired boilers require a Plan Review by the Office of the Fire Marshal. The installed boilers must meet all relevant codes and standards to minimize the chance of fire and spread of fire. Irrespective of the capacity of the proposed solid fuel fired boiler systems, a complete manufacturer design and engineering package sealed and signed by the respective professional shall be submitted to the OFM for review prior to starting construction at site.
Current Resource
PDF • 158.43KB • Issued May 2, 2016
Download Advisory - Solid Fuel Fired Boiler Systems